Pool Excavation Specialists

Pool Excavation
Adelaide

Digging your own pool? Our 1.7T and 1.8T mini excavators are perfect for residential pool digs. Fits through standard gates, powerful enough for the job. Add our car licence tipper truck for complete spoil removal.

990mm Wide Access Tipper Available Dry Hire, Dig It Yourself

DIY Pool Excavation Made Possible

Installing a swimming pool is one of the best investments you can make in your Adelaide home. But pool builders charge a premium for excavation - often $3,000-$8,000+ depending on access and soil conditions. Many homeowners are discovering they can save thousands by handling the dig themselves.

Our 1.8T JCB mini excavator (or the 1.7T Yanmar ViO17) is ideal for residential pool excavation. At just 990mm wide, the JCB fits through standard side gates - solving the "access problem" that makes many pool quotes expensive. Hire the excavator and tipper truck combo, and you can dig and remove spoil yourself.

All our excavators are dry hire. No licence is needed for machines under 6 tonnes on private property, we give you a full handover when we deliver, and you can phone us during the hire if you get stuck.

Mini excavator pool excavation

Our Excavator vs Your Pool Requirements

2,290mm

Max Dig Depth

✓ Deeper than most pools

4,030mm

Max Reach

✓ Covers standard pool widths

990mm

Machine Width

✓ Fits standard gates

1.8T

Operating Weight

✓ Safe on residential lawns

Pool Types We Excavate

Fibreglass Pools

The most common pool type in Adelaide. We dig the hole to your pool shell supplier's specifications, ensuring correct depth and dimensions for crane placement.

Typical depth: 1.2m - 1.8m
Dig time: 1-2 days
Spoil: 20-40m³ typical

Concrete Pools

Concrete pools often have more complex shapes and benching. We excavate to your pool builder's marked specifications, including steps and ledges.

Typical depth: 1.0m - 2.0m
Dig time: 1-3 days
Spoil: 25-50m³ typical

Plunge Pools

Compact plunge pools are perfect for Adelaide's smaller blocks. Our mini excavator is ideally sized for these smaller digs, even in tight backyards.

Typical depth: 1.2m - 1.5m
Dig time: Half day - 1 day
Spoil: 8-15m³ typical

Pool Excavation Process

1

Get Pool Specs

Your pool supplier provides excavation dimensions. We dig to their specs.

2

Check Access

Measure your gate/side access. 1m+ opening? We're in. Send photos if unsure.

3

Book Equipment

Excavator only, or combo with tipper for spoil removal. All dry hire.

4

Dig Day

We deliver and hand the machine over, you dig, and remove spoil as you go.

Before You Dig

  • • Call Dial Before You Dig (1100) to locate underground services
  • • Confirm pool position is marked by your pool supplier
  • • Check council requirements for setbacks and approvals
  • • Organise where spoil will be dumped (tip run plan)

Soil Conditions

  • • Clay soil (common in Adelaide) - slower going but manageable
  • • Sandy soil - faster excavation, watch for collapse
  • • Rock - may require rock breaker (ask about availability)
  • • Water table - discuss with your pool builder first

Pool Dig Cost Comparison

See how DIY pool excavation compares to pool builder quotes

Typical Pool Builder Quote

Excavation component

Standard access dig $3,000 - $5,000
Tight access premium +$1,500 - $3,000
Rock/hard soil premium +$1,000 - $2,000
Spoil removal Often extra

Total: $4,500 - $10,000+

Varies significantly by builder and conditions

DIY with Equip Hire

Excavator + Tipper Combo

1.8t excavator + tipper truck combo (per day) $375/day or $1,500/week
Tip fees (~30m³) ~$300 - $500
Fuel (excavator) ~$50 - $100
Your time (1-2 days) Your labour

Potential Savings: $2,000 - $6,000+

Depending on original builder quote

* Prices are estimates only. Hire rates include GST. Call for a quote specific to your pool project.

Planning Your Pool Dig

Dry Hire (DIY)

You Operate

Maximum savings - you do the dig. We deliver the excavator and tipper, give you a full handover, and you dig the pool yourself with phone support during the hire.

Good for you if:

  • You have excavator experience (or want to learn)
  • You have a helper for spotting and measuring
  • You're comfortable working to pool specs
  • Maximum budget savings is the priority
  • You have a way to get spoil to the tip (our tipper truck or trailer)

Tips for the Dig

Plan it before the machine arrives

  • Peg and string the pool outline, then dig a little under depth so you can trim back to level
  • Dig the deep end first, working back toward the exit ramp so you are not driving over finished ground
  • Stockpile only what you need for backfill; load the rest straight into the tipper
  • Keep a spotter on the edge, and keep people clear of the swing radius
  • Check the soil: sandy walls can collapse, so dig wider than the shell and slope the sides
  • Book the tipper for the same days as the excavator so the spoil never piles up

Popular choice: the 1.8t excavator and tipper truck combo, $375 per day or $1,500 per week.

Pool Excavation FAQs

Can your excavator dig deep enough for a pool?

Yes - our 1.8T JCB excavator has a maximum dig depth of 2,290mm (nearly 2.3 metres). Most residential pools range from 1.2m to 1.8m deep, well within its capability. For deeper ends, we work progressively.

Will you damage my lawn getting to the backyard?

Rubber tracks spread the machine's weight and minimise damage. Some lawn marking is inevitable, but nothing that won't recover. We're careful with access and can use boards if needed for soft ground.

How long does a pool dig take?

Typically 1-2 days for a standard fibreglass pool. Factors include pool size, soil conditions, and access. Add time for spoil removal trips. Plunge pools can be a half-day job.

What do I do with all the dirt?

Hire our excavator + tipper truck combo ($375 per day for the 1.8t). Load the tipper as you dig, tow it to the tip (Wingfield, Edinburgh North, or your local), dump, repeat. Plan for 4-8 trips depending on pool size.

What if I hit rock?

Adelaide soil can be rocky, especially in the Hills and parts of the north. Our excavator handles reasonable rock. For heavy rock, we can discuss rock breaker attachment options. Call Jack to discuss your site.

Do I need council approval to dig?

Pool installation typically requires development approval from your council. The dig itself usually doesn't need separate approval, but check your pool builder's requirements and local council regulations.

Ready to Dig Your Pool?

Call Jack to discuss your pool project. Bring your pool supplier's excavation specs and we'll provide a quote.

Pool Dig Ready

1.7T / 1.8T Excavator + Tipper

Based In

224 Kelly Rd, Modbury Heights SA 5092

Need it transported?

Our heavy-duty 8x4 tilt tray moves excavators, bobcats, scissor lifts, and earthmoving equipment across Adelaide. From $175. Combo discounts for hire customers.

Not sure which truck class your machine needs? Read the guide
Machinery Transport